Layouts, plant-room access, water/drainage assumptions and operating profile.
Ultra Cedar with External Turbo Mini Chiller (Ultra Fast) 4ºC (39F) Hong Kong – iCoolSport | Kung Sheung
An Ultra Cedar external cold plunge paired with a Turbo Mini chiller, delivering cooling power to bring an 800 litre capacity tub down to 4ºC…
Project Fit Review
Confirm suitability before procurement.
Share project drawings, site constraints or target usage. Specifications, installation interfaces and commercial terms are reviewed against the actual project.
Selection Workflow
Confirm fit before this product is specified.
Use this page as a shortlist marker. Kung Sheung checks drawings, interfaces and service access before recommending the final model route.
Model suitability, service clearance, control interface and maintenance access.
Supply scope, documentation requirements and installation support route.
Overview
Technical Overview
Ultra Cedar with External Turbo Mini Chiller (Ultra Fast) 4ºC (39F) is presented for project-specific review within Kung Sheung’s commercial bathroom and wellness engineering catalogue.
Manufacturer Product Details
This enhanced external chiller model connects to a Turbo Mini Chiller, which can be positioned up to 30 metres from the plunge pool. This configuration allows for the integration of optional sanitisation equipment into the return plumbing line leading to the Ultra's inlet port.
Project Review Considerations
- Confirm the exact model, configuration and compatible installation components against the approved schedule.
- Review connections, access, service clearance and finish coordination before procurement.
- Verify current manufacturer documentation and site conditions before final selection.
For projects in Hong Kong, Macau and the Greater Bay Area, Kung Sheung can review drawings, schedules and site constraints before commercial quotation.
Technical source: iCoolSport product page. Confirm the latest manufacturer documentation before specification.
Engineering Review
Installation & Serviceability Considerations
Confirm power, water, drainage, access and maintenance clearance against drawings.
Review usage frequency, water-treatment needs and service access before specification.
Final supply scope and commercial terms are issued after technical fit is reviewed.
Common Questions
Technical FAQ
Can your HK team install Ultra Cedar with External Turbo Mini Chiller (Ultra Fast) 4ºC (39F) for a hotel or sports facility?▼
Yes. Kung Sheung's HK engineering team handles full installation across Hong Kong, Macau and the Greater Bay Area since 1975.
What is the practical capacity and usage profile for Ultra Cedar with External Turbo Mini Chiller (Ultra Fast) 4ºC (39F)?▼
Capacity depends on your operating plan (hotel, clinic, or team environment). We provide a project-specific sizing recommendation before deployment.
Before procurement, which technical points should my operations team confirm?▼
For this model, confirm unit weight: 130.0 kg. Share your installation area and electrical/water setup, and we will finalize a compliant HK deployment plan.
Technical Review
Specify with project context, not assumptions.
Send layouts, BOQ references or usage requirements. Kung Sheung can review product fit, installation interfaces and documentation needs before quotation.