Olympia Cold Plunge System
Commercial cold water immersion engineered for hotel spa and wellness centre installation. High-turnover capacity with integrated chilling and filtration in a single skid-mounted package.
Technical Specification
Engineering-reviewed specification reference
| Performance | |
| Tank Capacity | 1,500 – 3,000 L (configurable) |
| Temperature Range | 4 – 15 °C |
| Temp Accuracy | ± 0.5 °C |
| Water Turnover | 30-minute full cycle |
| Cool-Down Time | < 2 hrs from ambient 20 °C |
| Mechanical | |
| Chiller Config | Skid-mounted, single package |
| Filtration | Integrated — cartridge + UV |
| Pump Type | Variable speed circulation pump |
| Control Interface | Touch panel + BMS output |
| Installation | |
| Install Type | In-ground or above-ground |
| Electrical Supply | 3-phase 380V / 50 Hz |
| Drainage | 50 mm floor drain minimum |
| Plant Room | Confirm at engineering review |
| Compliance | |
| Certification | CE marked |
| Water Quality | NSF / WHO guideline compatible |
| BMS Integration | Modbus RTU available |
- Suited to hotel spa with 4+ treatment rooms and daily turnover demand
- Compatible with existing MEP plant room for new-build and retrofit
- Supports single-unit and multi-unit zone configurations
- BMS-ready for central building management system integration
- Specified for high-humidity spa and wellness environments
Technical sheets, MEP coordination drawings and BOQ line item references available after engineering review enquiry.
- Stock and lead time confirmed at quotation stage
- Standard commercial lead time: 8 – 14 weeks from order
- Express options subject to availability — confirm via engineering
Engineering Note
What to confirm before shortlisting this system.
Kung Sheung reviews each project individually before issuing a commercial quotation. These are the typical coordination checkpoints for this product family.
Review first — always
This catalog listing is a specification starting point. Commercial pricing, technical sheet and BOQ format are issued after a brief engineering review conversation — not before.
Plant room dimensions and access
Confirm available mechanical room footprint, ceiling clearance and service access route before specifying skid configuration and pump sizing.
Electrical supply and BMS intent
3-phase supply and earthing arrangement should be confirmed with your M&E engineer. BMS integration protocol (Modbus / BACnet) to be agreed at design stage.
Water supply, drainage and treatment
Confirm mains water supply pressure, floor drain capacity and existing water treatment provision before finalising filtration specification.
Operational throughput and session model
Daily user volume and session duration directly affects system sizing. Confirm operational parameters for an accurate capacity specification.
Engineering Quote Request
Send drawings or scope for technical review.
Share available schematics, project type, location and target opening window. We will advise on feasibility, coordination requirements and next steps within 24 hours.