AstralPool Cold Plunge

Engineered Solution — OLY-CP-220

Olympia Cold Plunge System

Commercial cold water immersion engineered for hotel spa and wellness centre installation. High-turnover capacity with integrated chilling and filtration in a single skid-mounted package.

Hotel & Resort Wellness Club Private Residence Commercial Project
Capacity 1,500 – 3,000 L
Temp Range 4 – 15 °C
Turnover 30 min cycle
Accuracy ± 0.5 °C
HK / Macau / GBA Engineering review first Installation-aware 24h response
Reference OLY-CP-220
Brand AstralPool
Commercial pricing Available on request
Lead time 8 – 14 weeks typical
Distributor Kung Sheung International · HK & GBA

Technical Specification

Engineering-reviewed specification reference

Performance
Tank Capacity1,500 – 3,000 L (configurable)
Temperature Range4 – 15 °C
Temp Accuracy± 0.5 °C
Water Turnover30-minute full cycle
Cool-Down Time< 2 hrs from ambient 20 °C
Mechanical
Chiller ConfigSkid-mounted, single package
FiltrationIntegrated — cartridge + UV
Pump TypeVariable speed circulation pump
Control InterfaceTouch panel + BMS output
Installation
Install TypeIn-ground or above-ground
Electrical Supply3-phase 380V / 50 Hz
Drainage50 mm floor drain minimum
Plant RoomConfirm at engineering review
Compliance
CertificationCE marked
Water QualityNSF / WHO guideline compatible
BMS IntegrationModbus RTU available
Project Fit Summary
  • Suited to hotel spa with 4+ treatment rooms and daily turnover demand
  • Compatible with existing MEP plant room for new-build and retrofit
  • Supports single-unit and multi-unit zone configurations
  • BMS-ready for central building management system integration
  • Specified for high-humidity spa and wellness environments
Documentation

Technical sheets, MEP coordination drawings and BOQ line item references available after engineering review enquiry.

Technical Specification Sheet Request
MEP Coordination Drawing Request
BOQ Line Item Format Request
Lead Time & Availability
  • Stock and lead time confirmed at quotation stage
  • Standard commercial lead time: 8 – 14 weeks from order
  • Express options subject to availability — confirm via engineering

Engineering Note

What to confirm before shortlisting this system.

Kung Sheung reviews each project individually before issuing a commercial quotation. These are the typical coordination checkpoints for this product family.

Review first — always

This catalog listing is a specification starting point. Commercial pricing, technical sheet and BOQ format are issued after a brief engineering review conversation — not before.

Plant room dimensions and access

Confirm available mechanical room footprint, ceiling clearance and service access route before specifying skid configuration and pump sizing.

Electrical supply and BMS intent

3-phase supply and earthing arrangement should be confirmed with your M&E engineer. BMS integration protocol (Modbus / BACnet) to be agreed at design stage.

Water supply, drainage and treatment

Confirm mains water supply pressure, floor drain capacity and existing water treatment provision before finalising filtration specification.

Operational throughput and session model

Daily user volume and session duration directly affects system sizing. Confirm operational parameters for an accurate capacity specification.

Engineering Quote Request

Send drawings or scope for technical review.

Share available schematics, project type, location and target opening window. We will advise on feasibility, coordination requirements and next steps within 24 hours.

Shaping the future of wellness through intelligent design, trusted partnerships, and timeless craftsmanship.

🧭 Company

About Us

Our Services

Projects

Distributors

Contact

🛠 Support

Installation & Maintenance

Privacy Policy

Terms & Conditions

F.A.Q.

📍 Contact Us

© 2025 Kung Sheung International Co. Ltd. | All Rights Reserved