Layouts, plant-room access, water/drainage assumptions and operating profile.
Compact Water Filter Hong Kong – iCoolSport | Kung Sheung
It handles salt, mineral salt and fresh water up to 40ºC, using a UV-stabilised clear acrylic bowl, Nitrile O-ring seal and a replaceable synthetic cartridge.…
Project Fit Review
Confirm suitability before procurement.
Share project drawings, site constraints or target usage. Specifications, installation interfaces and commercial terms are reviewed against the actual project.
Selection Workflow
Confirm fit before this product is specified.
Use this page as a shortlist marker. Kung Sheung checks drawings, interfaces and service access before recommending the final model route.
Model suitability, service clearance, control interface and maintenance access.
Supply scope, documentation requirements and installation support route.
Overview
Technical Overview
Compact Water Filter (FP2-COM) is presented for project-specific review within Kung Sheung’s commercial bathroom and wellness engineering catalogue.
Manufacturer Product Details
Specifications
Application
Key features
- A Nitrile O-ring is fitted to every Compact Filter to ensure the unit remains leak free and to provide peace of mind
- The replaceable synthetic inner filter cartridge collects the particles and prevents their progression through the system
Dimensions
- L x W x H (cm): 24 x 10 x 36
- Internal Cartridge (cm): 8 x 14.5
- Clearance to remove cartridge: 80cm
- Inlet and Outlet PVC: 40/50
Operation
- Maximum water temperature: 40ºC
Maintenance
- Proper care and maintenance will add many years of service and enjoyment to your pool. Keep the exterior of the filter clean using a mild detergent and water
- Maintaining balanced water chemistry is important to the life of your pool pump. This filter is designed to be used with Pool & Spa water, balanced in accordance with Langlier Saturation Index, with a pH level of between 7.2 and 7.8 and is regularly treated with a chlorine sanitising agent with the level not exceeding 3000PPM. Please consult your local pool shop regularly to have your water tested
- Ideally it is suggested that you check your system for debris at least once a week, or as often as required for your particular installation
- We recommend replacing the internal cartridge every 3 or 6 months depending on usage
Project Review Considerations
- Confirm the exact model, configuration and compatible installation components against the approved schedule.
- Review connections, access, service clearance and finish coordination before procurement.
- Verify current manufacturer documentation and site conditions before final selection.
For projects in Hong Kong, Macau and the Greater Bay Area, Kung Sheung can review drawings, schedules and site constraints before commercial quotation.
Technical source: iCoolSport product page. Confirm the latest manufacturer documentation before specification.
Engineering Review
Installation & Serviceability Considerations
Confirm power, water, drainage, access and maintenance clearance against drawings.
Review usage frequency, water-treatment needs and service access before specification.
Final supply scope and commercial terms are issued after technical fit is reviewed.
Common Questions
Technical FAQ
Can your HK team install Compact Water Filter for a hotel or sports facility?▼
Yes. Kung Sheung's HK engineering team handles full installation across Hong Kong, Macau and the Greater Bay Area since 1975.
What is the practical capacity and usage profile for Compact Water Filter?▼
Capacity depends on your operating plan (hotel, clinic, or team environment). We provide a project-specific sizing recommendation before deployment.
Before procurement, which technical points should my operations team confirm?▼
For this model, confirm SKU: FP2-COM. Share your installation area and electrical/water setup, and we will finalize a compliant HK deployment plan.
Technical Review
Specify with project context, not assumptions.
Send layouts, BOQ references or usage requirements. Kung Sheung can review product fit, installation interfaces and documentation needs before quotation.