Layouts, plant-room access, water/drainage assumptions and operating profile.
MiPod Pro Cedar with Turbo Chiller Hong Kong – iCoolSport | Kung Sheung
The MiPod Pro Cedar with Turbo Chiller pairs the 600L fibreglass tub with an external 10,000W chiller, suited to commercial or club use. External dimensions…
Project Fit Review
Confirm suitability before procurement.
Share project drawings, site constraints or target usage. Specifications, installation interfaces and commercial terms are reviewed against the actual project.
Selection Workflow
Confirm fit before this product is specified.
Use this page as a shortlist marker. Kung Sheung checks drawings, interfaces and service access before recommending the final model route.
Model suitability, service clearance, control interface and maintenance access.
Supply scope, documentation requirements and installation support route.
Overview
Technical Overview
MiPod Pro Cedar with External Turbo Chiller (MS-PRO-R-CE-2) is presented for project-specific review within Kung Sheung’s commercial bathroom and wellness engineering catalogue.
Manufacturer Product Details
With external Ultra Powerful 10,000 Watt Chiller
Water Volume · 600L
For outstanding Commercial or Club use
Maximum capacity · 2 Large adults or 3 smaller people.
External Dimensions · Length 1580 x Width 835 x Depth 1225
Internal Dimensions · Length 1390 x Width 650 x Depth 1110 · Empty Weight Approx. 100 Kg · Weight filled with water Approx. 600Kg
Remote screen 13" and wall mount bracket included
Project Review Considerations
- Confirm the exact model, configuration and compatible installation components against the approved schedule.
- Review connections, access, service clearance and finish coordination before procurement.
- Verify current manufacturer documentation and site conditions before final selection.
For projects in Hong Kong, Macau and the Greater Bay Area, Kung Sheung can review drawings, schedules and site constraints before commercial quotation.
Technical source: iCoolSport product page. Confirm the latest manufacturer documentation before specification.
Engineering Review
Installation & Serviceability Considerations
Confirm power, water, drainage, access and maintenance clearance against drawings.
Review usage frequency, water-treatment needs and service access before specification.
Final supply scope and commercial terms are issued after technical fit is reviewed.
Common Questions
Technical FAQ
Can your HK team install MiPod Pro Cedar with Turbo Chiller for a hotel or sports facility?▼
Yes. Kung Sheung's HK engineering team handles full installation across Hong Kong, Macau and the Greater Bay Area since 1975.
What pool/tank volume is MiPod Pro Cedar with Turbo Chiller designed to support?▼
Based on product specs, recommended water volume is 600L For outstanding Commercial or Club use Maximum capacity2 Large adults or 3 smaller people. We can verify final sizing against your site layout before order.
Before procurement, which technical points should my operations team confirm?▼
For this model, confirm unit weight: 100.0 kg; SKU: MS-PRO-R-CE-2. Share your installation area and electrical/water setup, and we will finalize a compliant HK deployment plan.
Technical Review
Specify with project context, not assumptions.
Send layouts, BOQ references or usage requirements. Kung Sheung can review product fit, installation interfaces and documentation needs before quotation.