Layouts, plant-room access, water/drainage assumptions and operating profile.
MiPod Pro Chill Hong Kong – iCoolSport | Kung Sheung
Key components include a titanium heat exchanger, commercial-grade copper plumbing, marine-grade aluminium side panels and a 13-inch Full HD remote capacitive touch screen. It runs…
Project Fit Review
Confirm suitability before procurement.
Share project drawings, site constraints or target usage. Specifications, installation interfaces and commercial terms are reviewed against the actual project.
Selection Workflow
Confirm fit before this product is specified.
Use this page as a shortlist marker. Kung Sheung checks drawings, interfaces and service access before recommending the final model route.
Model suitability, service clearance, control interface and maintenance access.
Supply scope, documentation requirements and installation support route.
Overview
Technical Overview
MiPod Pro Chill is presented for project-specific review within Kung Sheung’s commercial bathroom and wellness engineering catalogue.
Manufacturer Product Details
1-2 person fully automatic fibreglass bath with built-in cooling unit
Finishes & Materials
- Pool: Fibreglass
- Colours: Space Black, Blue or Pearl White
- Heat Exchanger: Titanium
- Heat Pump Plumbing: Commercial Grade Copper
- Strip: Chrome
- Side Panels: Marine Grade Aluminium
Display
- Software-chip: Developed by iCool
- Display: Animated Remote 13 inch Full HD Capacitive Touch Screen
Electrical
- Power Plug: 3 Pin heavy duty to suit country (UK, US, AUS or EU)
- Air flow Capacity: Low noise fan 2000 cubic ft per minute
- Internal Fan Size: 300 mm
- Sound: 59 dBA tested at 1.5m
- Heat Pump Type: Rotary Compressor
- Water Pump: Powered by the chiller via the built-in RCD electrical safety device
Inclusions
- 13 inch HD Remote Touch Screen with wall-mount bracket and 5m data cable
- Two (2) non-slip internal steps
- Powerful built-in cooling unit under the steps with easy access to machinery
- Built-in industrial water circulation pump with all plumbing fitted & ready to use
- Water drain connection and valve to suit 12mm hose
- Power Plug to suit country
Owner’s Manual
Project Review Considerations
- Confirm the exact model, configuration and compatible installation components against the approved schedule.
- Review connections, access, service clearance and finish coordination before procurement.
- Verify current manufacturer documentation and site conditions before final selection.
For projects in Hong Kong, Macau and the Greater Bay Area, Kung Sheung can review drawings, schedules and site constraints before commercial quotation.
Technical source: iCoolSport product page. Confirm the latest manufacturer documentation before specification.
Engineering Review
Installation & Serviceability Considerations
Confirm power, water, drainage, access and maintenance clearance against drawings.
Review usage frequency, water-treatment needs and service access before specification.
Final supply scope and commercial terms are issued after technical fit is reviewed.
Common Questions
Technical FAQ
Can your HK team install MiPod Pro Chill for a hotel or sports facility?▼
Yes. Kung Sheung's HK engineering team handles full installation across Hong Kong, Macau and the Greater Bay Area since 1975.
What is the practical capacity and usage profile for MiPod Pro Chill?▼
Capacity depends on your operating plan (hotel, clinic, or team environment). We provide a project-specific sizing recommendation before deployment.
Before procurement, which technical points should my operations team confirm?▼
For this model, confirm unit weight: 100.0 kg. Share your installation area and electrical/water setup, and we will finalize a compliant HK deployment plan.
Technical Review
Specify with project context, not assumptions.
Send layouts, BOQ references or usage requirements. Kung Sheung can review product fit, installation interfaces and documentation needs before quotation.