Skip to content
iCoolSport Accessories

Spare part - Titanium Tank 1.5

iCoolSport synced product: Spare part - Titanium Tank 1.5

Commercial Route
Technical review before quotation
Service Region
Hong Kong · Macau · Greater Bay Area

Project Fit Review

Confirm suitability before procurement.

Share project drawings, site constraints or target usage. Specifications, installation interfaces and commercial terms are reviewed against the actual project.

Selection Workflow

Confirm fit before this product is specified.

Use this page as a shortlist marker. Kung Sheung checks drawings, interfaces and service access before recommending the final model route.

01 Send drawings or constraints

Layouts, plant-room access, water/drainage assumptions and operating profile.

02 Confirm technical fit

Model suitability, service clearance, control interface and maintenance access.

03 Define quotation basis

Supply scope, documentation requirements and installation support route.

Overview

Technical Overview

The iCoolSport Spare part – Titanium Tank 1.5 is a genuine spare part engineered for the iCoolSport cold plunge and recovery system range. Designed for commercial and residential installations across Hong Kong, Macau and the Greater Bay Area (粵港澳大灣區), this component ensures continued system performance and operational reliability.

Genuine iCoolSport replacement part for maintaining system integrity. Suitable for commercial facilities including hotel wellness centers, club recovery spaces, and performance training environments throughout the 粵港澳大灣區 region. Compatible with iCoolSport systems supplied and installed by Kung Sheung International.

Contact Kung Sheung’s technical support team for availability, installation guidance and pricing for iCoolSport spare parts across Hong Kong, Macau and Guangdong province.

Engineering Review

Installation & Serviceability Considerations

Site Interfaces

Confirm power, water, drainage, access and maintenance clearance against drawings.

Operating Requirements

Review usage frequency, water-treatment needs and service access before specification.

Quotation Basis

Final supply scope and commercial terms are issued after technical fit is reviewed.

Technical Review

Specify with project context, not assumptions.

Send layouts, BOQ references or usage requirements. Kung Sheung can review product fit, installation interfaces and documentation needs before quotation.