Skip to content
iCoolSport Portable Chillers

Turbo Mini Dual Temp Hong Kong – iCoolSport | Kung Sheung

A single engine ice bath heat pump engineered for rapid chilling and heating of smaller pools up to approximately 2000 litres or around six users.

Reference / SKU
ICS-TRBM-S2-DT
Commercial Route
Technical review before quotation
Service Region
Hong Kong · Macau · Greater Bay Area

Project Fit Review

Confirm suitability before procurement.

Share project drawings, site constraints or target usage. Specifications, installation interfaces and commercial terms are reviewed against the actual project.

Selection Workflow

Confirm fit before this product is specified.

Use this page as a shortlist marker. Kung Sheung checks drawings, interfaces and service access before recommending the final model route.

01 Send drawings or constraints

Layouts, plant-room access, water/drainage assumptions and operating profile.

02 Confirm technical fit

Model suitability, service clearance, control interface and maintenance access.

03 Define quotation basis

Supply scope, documentation requirements and installation support route.

Overview

Technical Overview

Turbo Mini Dual Temp (ICS-TRBM-S2-DT) is presented for project-specific review within Kung Sheung’s commercial bathroom and wellness engineering catalogue.

Manufacturer Product Details

The Most Powerful Single Engine Ice Bath Heat Pump to Turbo Chill & Heat most of our large pool range.

The Turbo Mini provides rapid industrial grade cooling & heating for smaller pools up to a maximum of 2000 litres (or 6 users) at a lower initial cost. This design provides excellent chilling and heating power in a smaller size while maintaining all of the operational simplicity and technological benefits of the larger TurboCools.

Chill or heat your bath in an hour or so, don’t wait all day like most others on the market.

Extremely Quiet operation, 58dB at 5m.

Standard temperature range is from 4ºC (39F) to 40ºC (104F).

Large Remote 13" wall mount touch screen controller included.

L544mm X W386mm X H831mm

Suits the following iCool Pools;

TR2000 : MiPod Pro : MiPod Elite : Ultra

Project Review Considerations

  • Confirm the exact model, configuration and compatible installation components against the approved schedule.
  • Review connections, access, service clearance and finish coordination before procurement.
  • Verify current manufacturer documentation and site conditions before final selection.

For projects in Hong Kong, Macau and the Greater Bay Area, Kung Sheung can review drawings, schedules and site constraints before commercial quotation.

Request Technical Review

Technical source: iCoolSport product page. Confirm the latest manufacturer documentation before specification.

Engineering Review

Installation & Serviceability Considerations

Site Interfaces

Confirm power, water, drainage, access and maintenance clearance against drawings.

Operating Requirements

Review usage frequency, water-treatment needs and service access before specification.

Quotation Basis

Final supply scope and commercial terms are issued after technical fit is reviewed.

Common Questions

Technical FAQ

Can your HK team install Turbo Mini Dual Temp for a hotel or sports facility?▼

Yes. Kung Sheung's HK engineering team handles full installation across Hong Kong, Macau and the Greater Bay Area since 1975.

What is the practical capacity and usage profile for Turbo Mini Dual Temp?▼

Capacity depends on your operating plan (hotel, clinic, or team environment). We provide a project-specific sizing recommendation before deployment.

Before procurement, which technical points should my operations team confirm?▼

For this model, confirm temperature: 4ºC (39F) to 40ºC; unit weight: 68.0 kg; SKU: ICS-TRBM-S2-DT. Share your installation area and electrical/water setup, and we will finalize a compliant HK deployment plan.

Technical Review

Specify with project context, not assumptions.

Send layouts, BOQ references or usage requirements. Kung Sheung can review product fit, installation interfaces and documentation needs before quotation.