Layouts, plant-room access, water/drainage assumptions and operating profile.
Ultra Cedar (No Chiller) Hong Kong – iCoolSport | Kung Sheung
The Ultra Cedar cold plunge is designed for 2 to 4 users and pairs the same insulated fibreglass construction and cedar exterior as the chilled…
Project Fit Review
Confirm suitability before procurement.
Share project drawings, site constraints or target usage. Specifications, installation interfaces and commercial terms are reviewed against the actual project.
Selection Workflow
Confirm fit before this product is specified.
Use this page as a shortlist marker. Kung Sheung checks drawings, interfaces and service access before recommending the final model route.
Model suitability, service clearance, control interface and maintenance access.
Supply scope, documentation requirements and installation support route.
Overview
Technical Overview
Ultra Cedar (No Chiller) is presented for project-specific review within Kung Sheung’s commercial bathroom and wellness engineering catalogue.
Manufacturer Product Details
This product is offered to accommodate those who wish to upgrade their existing ice bath while facilitating chilling independently.
The water pump and plumbing are all built-in, ready for you to connect your existing Tubo Mini or Turbo Typhoon.
The tub is made from premium hand-moulded insulated fibreglass and is a seamless surface fit for comfort and easy cleaning.
Optional turbocharged external chiller versions. This means adding a powerful Turbo Mini Chiller can be placed anywhere within 30 metres of your pool and adds the ability to include a broader range of sanitisation options.
We also offer a range of customisation options, with various timber or metal cladding finishes and colours upon request.
Project Review Considerations
- Confirm the exact model, configuration and compatible installation components against the approved schedule.
- Review connections, access, service clearance and finish coordination before procurement.
- Verify current manufacturer documentation and site conditions before final selection.
For projects in Hong Kong, Macau and the Greater Bay Area, Kung Sheung can review drawings, schedules and site constraints before commercial quotation.
Technical source: iCoolSport product page. Confirm the latest manufacturer documentation before specification.
Engineering Review
Installation & Serviceability Considerations
Confirm power, water, drainage, access and maintenance clearance against drawings.
Review usage frequency, water-treatment needs and service access before specification.
Final supply scope and commercial terms are issued after technical fit is reviewed.
Common Questions
Technical FAQ
Can your HK team install Ultra Cedar (No Chiller) for a hotel or sports facility?▼
Yes. Kung Sheung's HK engineering team handles full installation across Hong Kong, Macau and the Greater Bay Area since 1975.
What is the practical capacity and usage profile for Ultra Cedar (No Chiller)?▼
Capacity depends on your operating plan (hotel, clinic, or team environment). We provide a project-specific sizing recommendation before deployment.
Before procurement, which technical points should my operations team confirm?▼
For this model, confirm unit weight: 130.0 kg. Share your installation area and electrical/water setup, and we will finalize a compliant HK deployment plan.
Technical Review
Specify with project context, not assumptions.
Send layouts, BOQ references or usage requirements. Kung Sheung can review product fit, installation interfaces and documentation needs before quotation.